I've wanted to do this new bed since last year.
Today was simply too nice to wait any longer.
Messy area, torn up lawn where the septic tank was replaced last year.
Two cedar stumps need to be chainsawed by H.
H will bring in a turf cutter to get rid of the old lawn, re-levelling, then new turf will be laid down.
<img src="http://farm6.static.flickr.com/5254/552 ... 7dc68f.jpg" width="500" height="375" alt="DSC04591" />
<img src="http://farm6.static.flickr.com/5097/552 ... d9eb69.jpg" width="375" height="500" alt="DSC04596" />
They're planted permanently, at last.
Power nearby, so will probably do C-9's and some sort of Teepee protection.
Watered the Trachy in the palm hut...drier than popcorn 6 inches down.
Dismantling takes 3 people and carpenter is still away...darn.
Door has been open for 2+ weeks.
<img src="http://farm6.static.flickr.com/5054/552 ... c59082.jpg" width="375" height="500" alt="DSC04593" />
CIDP and Trachies out of the cold building:
<img src="http://farm6.static.flickr.com/5211/552 ... 7e7d03.jpg" width="375" height="500" alt="DSC04588" />
Sunny and beautiful (except during photos)

Barb